The offshore wind farm is upgraded so that 15 old 2.5 MW Nordex turbines are replaced with 9 new 4.2 / 4.3 MW Vesta turbines. This means new foundations and changed positions. Assessment of exploitable values of the infrastructure was needed. The assignment was given to Industritaksering AS.